Bug 60104 - SetUp and TearDown at Thead group level
Summary: SetUp and TearDown at Thead group level
Status: NEW
Alias: None
Product: JMeter
Classification: Unclassified
Component: Main (show other bugs)
Version: 3.0
Hardware: PC Linux
: P2 enhancement (vote)
Target Milestone: ---
Assignee: JMeter issues mailing list
URL:
Keywords:
Depends on:
Blocks:
 
Reported: 2016-09-10 08:54 UTC by harsh
Modified: 2016-09-10 08:54 UTC (History)
0 users



Attachments

Note You need to log in before you can comment on or make changes to this bug.
Description harsh 2016-09-10 08:54:51 UTC
Hi, 

Currently,Tear down and set-up is executed at pre and post execution of all thread group. The purpose of thread group is to set-up or clear the resources. 

In load testing or functional testing, set-up or clear the resources also required at thread group level. 

this can be done through a sampler, But in this case, many problems occurred. 
1) For clean-up purpose, I have to continue test plan even if it fails.
2) By looking at test, I can not say that which are my test step and which are my clean-up and set-up steps.