Issue 81772 - wrong date in report created with wizzard
Summary: wrong date in report created with wizzard
Status: CLOSED IRREPRODUCIBLE
Alias: None
Product: Base
Classification: Application
Component: code (show other issues)
Version: OOo 2.3
Hardware: All Windows Vista
: P3 Trivial (vote)
Target Milestone: ---
Assignee: dbaneedsconfirm
QA Contact: issues@dba
URL:
Keywords: needmoreinfo
Depends on:
Blocks:
 
Reported: 2007-09-20 09:22 UTC by thomaskrumbein
Modified: 2008-06-18 12:50 UTC (History)
2 users (show)

See Also:
Issue Type: DEFECT
Latest Confirmation in: ---
Developer Difficulty: ---


Attachments
screenshot of the missing features (20.29 KB, image/png)
2007-09-20 09:23 UTC, thomaskrumbein
no flags Details
picture 1 - wrong date value (100.18 KB, text/plain)
2007-10-29 08:24 UTC, thomaskrumbein
no flags Details
picture 2 - wrong date value (43.26 KB, image/png)
2007-10-29 08:25 UTC, thomaskrumbein
no flags Details
picture 3 - wrong date value (62.45 KB, image/png)
2007-10-29 08:26 UTC, thomaskrumbein
no flags Details

Note You need to log in before you can comment on or make changes to this issue.
Description thomaskrumbein 2007-09-20 09:22:38 UTC
creating a report using the build in wizzard creates an wrong date (it is fixed
to "26.04.02").
Even the title - during using the wizzard it is correct displayed - is not
stored in the document. The field-variable is empty.
Comment 1 thomaskrumbein 2007-09-20 09:23:59 UTC
Created attachment 48359 [details]
screenshot of the missing features
Comment 2 christoph.lukasiak 2007-10-23 15:54:03 UTC
1. what kind of data source do you use? the native (hsql)? and how do you connect?
2. may you add a small sample database file (or attach dump)
3. please provide a step by step description

thx
Comment 3 thomaskrumbein 2007-10-29 08:23:25 UTC
Hey,

well, just try it! 
I use the nativ hsql db, connection is standard. I am working with MS Vista, OOo
2.3.0 (see properties of this issue).
Step by step description? well, just try it!
create a new database (HSQL). Create a table. fill in some values. store
everything. create a report using the wizzard - even in the first step you can
find the wrong date-value in the upper left corner - see new picture 1 (but you
can see the same value looking at the old screenshot!).
After creating the report you can see the field (textfield) - fixed type, but
wron value! see picture 2 and 3). to "repair" this behaviour I can change the
fieldtype to "not fixed" and close the properties. After this I can change the
fieldtype again to "fixed", then the correct value will be displayed. 
Comment 4 thomaskrumbein 2007-10-29 08:24:40 UTC
Created attachment 49226 [details]
picture 1 - wrong date value
Comment 5 thomaskrumbein 2007-10-29 08:25:36 UTC
Created attachment 49227 [details]
picture 2 - wrong date value
Comment 6 thomaskrumbein 2007-10-29 08:26:35 UTC
Created attachment 49228 [details]
picture 3 - wrong date value
Comment 7 christoph.lukasiak 2008-05-07 10:46:14 UTC
does this problem still occure?
Comment 8 drewjensen.inbox 2008-06-03 18:00:39 UTC
The problem was easily reproducable using 2.3.1 / XP

It does not occur using 2.4.1 RC2 / XP - the date when editing the report 
layout is inaccurate, but when the report is run the date is correct.

Given this and the fact that the reporting has not responded I resolving this 
as WORKSFORME

@thomaskrumbein if you are still having the problem under Vista with the 
current release you may reopen the issue.
Comment 9 christoph.lukasiak 2008-06-18 12:50:57 UTC
=> close