Issue 88876 - Connectors don't update when animating the shapes that they're connecting.
Summary: Connectors don't update when animating the shapes that they're connecting.
Status: CONFIRMED
Alias: None
Product: Impress
Classification: Application
Component: formatting (show other issues)
Version: OOo 2.4.0
Hardware: All All
: P3 Trivial (vote)
Target Milestone: ---
Assignee: AOO issues mailing list
QA Contact:
URL:
Keywords:
Depends on:
Blocks:
 
Reported: 2008-04-30 10:22 UTC by jaumealcazo
Modified: 2017-05-20 11:08 UTC (History)
1 user (show)

See Also:
Issue Type: DEFECT
Latest Confirmation in: ---
Developer Difficulty: ---


Attachments

Note You need to log in before you can comment on or make changes to this issue.
Description jaumealcazo 2008-04-30 10:22:24 UTC
You have two shapes, for example a square and a circle. You make a connector
connecting these two. 

Then you move one of the shapes with an moving path, to the right, for instance.

The connector SHOULD POINT the circle all along the animation, but IT DOESN'T.

It makes nosense and it's a big problem when you try to point things with arrows.

(The second shape should be invisible and you could point things with the arrows).

Sorry for bad english, i'm not from the USA.

Bye!
Comment 1 wolframgarten 2008-04-30 10:55:43 UTC
Priority lowered. Please have a look at
http://qa.openoffice.org/scdocs/ddIssues_EnterModify.html#priority for correct
setting of priority. Thanks.
Reproducible. Reassigned.
Comment 2 Marcus 2017-05-20 11:08:50 UTC
Reset assigne to the default "issues@openoffice.apache.org".