It should be possible to continue the execution of a testplan at that point one stopped it before.
(In reply to comment #0) > It should be possible to continue the execution of a testplan at that point one > stopped it before. Some kind of "pause / resume" action should be available which would give some time to be sure things are done well. This time would let the user browse the already available results and decide if (s)he wants to go on with the testplan or abort the operation. <not_serious_mode> The impossibility of pausing the run makes JMeter act as a real-time RPG : if you're not fast enough, you're dead. Ok, I'll stop playing Starcraft :p </not_serious_mode>
*** This bug has been marked as a duplicate of bug 49974 ***
This issue has been migrated to GitHub: https://github.com/apache/jmeter/issues/1625