This Bugzilla instance is a read-only archive of historic NetBeans bug reports. To report a bug in NetBeans please follow the project's instructions for reporting issues.

Bug 124571 - FAST:POC:CEW4 FAST:PRIORITY:3-IMPORTANT PL Update required
Summary: FAST:POC:CEW4 FAST:PRIORITY:3-IMPORTANT PL Update required
Status: RESOLVED FIXED
Alias: None
Product: soa
Classification: Unclassified
Component: BPEL Project (show other bugs)
Version: 6.x
Hardware: All All
: P3 blocker (vote)
Assignee: Vladimir Yaroslavskiy
URL:
Keywords:
Depends on:
Blocks:
 
Reported: 2008-01-02 13:41 UTC by mfoster
Modified: 2008-01-24 10:03 UTC (History)
1 user (show)

See Also:
Issue Type: ENHANCEMENT
Exception Reporter:


Attachments

Note You need to log in before you can comment on or make changes to this bug.
Description mfoster 2008-01-02 13:41:02 UTC
If the WSDL on which a PL depends has been changed (for instance re-imported from external), there is no easy way to
reflect this change in the PL. The PL itself should have an "update" option, perhaps when right-clicking it.
Comment 1 mfoster 2008-01-02 13:58:56 UTC
Another possibility would be to allow the new WSDL to be dropped on the existing PL.
Comment 2 Alexey Yarmolenko 2008-01-15 13:31:40 UTC
PartnerLink on diagram should update it's content when WSDL, containing related PartnerLinkType, Role, PortType, etc is
changed. For example, adding, removing, renaming operations in PortType will be reflected on diagram. But, this will not
work if modifications done to WSDL breaks link integrity, for example, renaming PortType without changing portType
attribute for role element. In this case PL element on diagram will appear as empty until the link integrity will be
fixed. To avoid this problem, user should use refactoring feature available for WSDL and schema editors.

Comment 3 Vladimir Yaroslavskiy 2008-01-24 10:03:48 UTC
If you change something in wsdl file via refactoring action, PartnerLink on diagram is updated automatically. If you
like to change in source code without refactoring, you must do changes in bpel too or choose new values of PartnerLink
on diagram, it can't be done automatically (~ update button) because there are can be many cases.

Mark as fixed because PL is updated if wsdl is changed via refactoring.