This Bugzilla instance is a read-only archive of historic NetBeans bug reports. To report a bug in NetBeans please follow the project's instructions for reporting issues.

Bug 236542 - NetBeans JIRA plugin clears multiple values in multi checkbox field on updated issue
Summary: NetBeans JIRA plugin clears multiple values in multi checkbox field on update...
Status: NEW
Alias: None
Product: connecteddeveloper
Classification: Unclassified
Component: Jira (show other bugs)
Version: 7.3.1
Hardware: PC Windows 7
: P3 normal (vote)
Assignee: Tomas Stupka
URL:
Keywords:
Depends on:
Blocks:
 
Reported: 2013-09-30 10:32 UTC by JoM77
Modified: 2013-10-14 13:26 UTC (History)
0 users

See Also:
Issue Type: DEFECT
Exception Reporter:


Attachments
field update example (7.16 KB, image/png)
2013-09-30 10:41 UTC, JoM77
Details

Note You need to log in before you can comment on or make changes to this bug.
Description JoM77 2013-09-30 10:32:33 UTC
Product Version = NetBeans IDE 7.3.1 (Build 201306052037)
Operating System = Windows 7 version 6.1 running on amd64
Java; VM; Vendor = 1.6.0_35
Runtime = Java HotSpot(TM) 64-Bit Server VM 20.10-b01

I am using JIRA (version 4.4.3) as IssueTracker. Update issue in JIRA using NetBeans JIRA plugin on Mercurial commit. Updated JIRA issue containins custom multi checkbox field. If updated issue has more than 1 value checked on this custom multi checkbox, after update from NetBeans are all checked fields  but last one cleared (e.g. before update 3 values checked, after update remains only 1 checked). No error is produced.
Comment 1 JoM77 2013-09-30 10:41:47 UTC
Created attachment 140649 [details]
field update example