This Bugzilla instance is a read-only archive of historic NetBeans bug reports. To report a bug in NetBeans please follow the project's instructions for reporting issues.

Bug 89224 - A11Y: ctrl-enter adds incorrect synchronous and asynchronous messages
Summary: A11Y: ctrl-enter adds incorrect synchronous and asynchronous messages
Status: VERIFIED FIXED
Alias: None
Product: uml
Classification: Unclassified
Component: Diagram Sequence (show other bugs)
Version: 5.x
Hardware: All All
: P2 blocker (vote)
Assignee: Trey Spiva
URL:
Keywords: A11Y
Depends on:
Blocks:
 
Reported: 2006-11-13 15:24 UTC by Sergey Petrov
Modified: 2006-11-22 14:32 UTC (History)
1 user (show)

See Also:
Issue Type: DEFECT
Exception Reporter:


Attachments

Note You need to log in before you can comment on or make changes to this bug.
Description Sergey Petrov 2006-11-13 15:24:11 UTC
reproducible with 061112_2

ctrl-enter adds incorrect synchronous and asynchronous messages
step:
1. create sequence diagram
2. add two lifelines and select
3. use ctrl-enter palette
center-center links added, started on distance from lifelines, without message
region

user should be asked where to place new link because order is important (and
can't be changed after creation) on sequence diagram and link should be
correctly displayed
Comment 1 Trey Spiva 2006-11-21 17:19:45 UTC
This is now fixed.  See the Issue 89710 for a description of how to use the keystrokes.
Comment 2 Sergey Petrov 2006-11-22 12:29:48 UTC
third synchroneour message is corrupted, I'll verify this issue a bit later
Comment 3 Sergey Petrov 2006-11-22 14:03:47 UTC
verified with 061121_17
problems with multiple issue will be filed in separate bug
Comment 4 Trey Spiva 2006-11-22 14:32:18 UTC
This is not what I was seeing.  I was able to add multiple messages, and they
all show up correctly.  Please give me your use case.