Issue 68626 - Async Load project
Summary: Async Load project
Status: CONFIRMED
Alias: None
Product: General
Classification: Code
Component: www (show other issues)
Version: OOo 2.0.2
Hardware: All All
: P3 Trivial (vote)
Target Milestone: AOO Later
Assignee: AOO issues mailing list
QA Contact:
URL:
Keywords:
Depends on:
Blocks:
 
Reported: 2006-08-15 07:28 UTC by wangyumin_ccoss
Modified: 2017-05-20 11:31 UTC (History)
8 users (show)

See Also:
Issue Type: ENHANCEMENT
Latest Confirmation in: ---
Developer Difficulty: ---


Attachments

Note You need to log in before you can comment on or make changes to this issue.
Description wangyumin_ccoss 2006-08-15 07:28:19 UTC
When we open a large PPT file or openoffice other XML file f.e.odp file, we 
will wait for a long time to see the content of the file. Conversely openning 
the same file through MS PowerPoint will be fluent a lot, almost at once we 
will see the first some pages. In OpenOffice, the pages should be shown after 
all the pages are loaded. So we can modify the current documention load 
mechanism in impress application, first of all we load the first n pages, as 
for other pages we just create empty slides, and then we will contiue to load 
other non-loaded pages in the background. So We can operate the pages which 
have been loaded at the same time other non-loaded pages can be loaded.
Comment 1 wangyumin_ccoss 2006-08-16 06:44:26 UTC
I am working with Intel (Anto Xu and Dhananjay Keskar) and Christian Lippka 
for async load of documents.
Comment 2 Mathias_Bauer 2006-12-13 17:40:24 UTC
As we still haven't seen a project plan I set this target to "OOoLater". This
can be changed if we can make a proper estimation about the work to do.
Comment 3 Mathias_Bauer 2006-12-13 17:47:58 UTC
Confirmed, as the description is correct.
Comment 4 Marcus 2017-05-20 11:31:35 UTC
Reset assigne to the default "issues@openoffice.apache.org".