Issue 5543 - changing the component of an issue does not update addressee list
Summary: changing the component of an issue does not update addressee list
Status: CLOSED DUPLICATE of issue 2287
Alias: None
Product: Infrastructure
Classification: Infrastructure
Component: Bugzilla (show other issues)
Version: current
Hardware: All All
: P2 Trivial (vote)
Target Milestone: ---
Assignee: Unknown
QA Contact: issues@www
URL:
Keywords:
Depends on:
Blocks:
 
Reported: 2002-06-04 12:58 UTC by Frank Schönheit
Modified: 2003-12-27 10:23 UTC (History)
1 user (show)

See Also:
Issue Type: DEFECT
Latest Confirmation in: ---
Developer Difficulty: ---


Attachments

Note You need to log in before you can comment on or make changes to this issue.
Description Frank Schönheit 2002-06-04 12:58:07 UTC
When changing the component of an issue, this is not reflected in what I would
call the addressee list of the issue.
Means if you change the component from A to B, then changes in the issue do
_not_ result in mails to issues@B.openoffice.org. Instead, they are still routed
to issues@A.openoffice.org.

My most recent example (I had some more in the past) for this is issue 5524,
which was originally report for "installation", but then changed to "database
access". None of the auto-generated mails for this issue uis directed to
issues@dba, but only to issues@installation (plus, of course, to the owner of
the bug).

This makes tracking of issues relative to a component very diffifult, without
using the queries on a regular basis.

IMO, changing the component should result in completely exchanging the issue@*
addressee, but at least in adding the issues-list of the new component.
Comment 1 lsuarezpotts 2002-06-05 01:35:56 UTC
I think this is actually an old issue. But am assigning to 
support@openoffice.org.
Comment 2 Frank Schönheit 2002-06-05 07:13:07 UTC
Louis,

what does "old" mean? duplicate? didn't find anything.
Nevertheless, it's actually there, so it's also a "current" issue :)

Frank
Comment 3 Unknown 2002-06-05 19:09:06 UTC
I am resolving this issue as a duplicate of issue 2287

Updating the QA contact when changing the component an issue belongs
to is addressed in the 2.0 release of SourceCast.

Thank you,
Kat

*** This issue has been marked as a duplicate of 2287 ***
Comment 4 michael.bemmer 2003-03-11 17:20:04 UTC
As mentioned on the qa dev list on March 5th I will close all resolved duplicate
issues. Please see this posting for details. First step in IssueZilla is
unfortunately to set them to verified.
Comment 5 michael.bemmer 2003-03-11 17:57:54 UTC
As mentioned on the qa dev list on March 5th I will close all resolved duplicate
issues. Please see this posting for details.